Independent Indoor Environmental Professional | Huntsville and North Alabama
Hazards are identified before the walls are opened. The home is documented. The protocol is written for the job as it will be performed in the field. Engagements are accepted from property owners, insurance carriers and legal counsel.
Focus
The people living in the home come first on every job. Site visits during the work verify that the containment is in place and the work is being done as written.
The condition of the home is recorded in writing with photographs, laboratory results and standard citations. The record is prepared for review by any party to the project.
Asbestos-containing materials, mold growth, contaminated water and concealed moisture are identified before demolition begins.
Protocols are written by a professional who has performed the work. They account for the access, the layout and the conditions the crew will have on site.
Before the First Cut
After a water loss, a crew is in the home within hours and the walls are cut out the same day. Joint compound, ceiling texture, flooring and duct insulation can contain asbestos. In most homes, no one tested first.
Fibers too small to see are released into the air of the home.
They land on floors, furniture, clothing and inside the ductwork.
Every time the heating and cooling system runs, it moves those fibers through each room it serves.
Fibers that lodge in lung tissue can remain there for life. Disease can develop decades after the exposure.
A sample taken before demolition is a small cost. After a release, the structure, the contents and the duct system all have to be addressed.
A homeowner who knows what is in the walls can require the right controls before work begins. A homeowner who was never told has no opportunity to stop the work.
The exposure reaches the family, their guests, the crew that made the cuts, every contractor who follows and the next owner of the home.
Have the home checked before the work starts.
Call 256-541-2858Independence
The same inspection method, the same published standards and the same report format apply to every engagement. The findings do not change based on which party retains the IEP.
Each engagement has one retaining party. The retaining party is named in the report.
Fees are billed for time and sampling. No fee depends on the findings or on the result of a claim or dispute.
On a project where Sam Howard is retained as the IEP, he does not bid on or perform the remediation, restoration or repair work.
Each request is reviewed for conflicts before it is accepted. A request is declined where a financial interest exists in the work being evaluated.
Samples are collected under chain of custody and analyzed by an accredited laboratory. The laboratory report is included with the findings.
Reports state the conditions observed and the requirements of the applicable published standard. Decisions on the project remain with the client.
Services
Site inspection of the affected areas, the water source and the extent of moisture. Water category is determined under ANSI/IICRC S500.
Inspection for suspected microbial growth and the moisture conditions that support it. Mold condition is determined under ANSI/IICRC S520.
Air and surface samples are collected where the assessment requires them. Analysis is performed by an accredited laboratory.
Written protocols specific to the property and the loss. Each requirement is stated with its standard citation.
Scheduled visits during remediation and a final visual verification when the work is complete. Written findings follow each visit.
Review of mitigation and remediation records, photographs and reports against ANSI/IICRC S500 and S520.
Samples of suspect building materials are collected at the request of a homeowner to identify what is present in the home. Analysis is performed by an accredited laboratory. The results are reported to the homeowner for the homeowner's information.
Where an accredited asbestos inspection is required, including inspections for employers and contractors, the inspection is performed by a state accredited asbestos inspector. This office coordinates the scheduling, the evaluation and the reporting. The inspection report is issued by the accredited inspector.
Sam Howard is not a state accredited asbestos inspector. Homeowner sampling results are informational and are not an asbestos inspection for OSHA or other regulatory compliance.
Clients
Independent environmental assessment of a reported loss.
Assessment and written requirements for a home or building.
Evaluations for plaintiff and defense counsel.
Process
The request, the property and the parties involved are reviewed before acceptance.
The scope of the evaluation and the fee schedule are set in writing with the retaining party.
The property is inspected and samples are collected where the assessment requires them.
The report states the findings, the requirements and the standard citations. It is issued to the retaining party.
Rates
The same rates apply to every client.
Protocols, reports, documentation and file review.
Site visits, inspections and sample collection.
File review, analysis and report preparation for legal matters.
Site evaluations performed for legal matters.
Per deposition, plus travel expenses.
Per day of required attendance, plus travel expenses. A half day is $2,000.
Field time begins on departure from the office and ends on return to the office.
Independent laboratory analysis and testing are billed separately from the hourly rates. Full sampling ranges from $250 to $1,100.
Qualifications
Contact
Provide the property address, the type of loss and the parties involved. Requests are answered with availability and a written engagement.